Ware Church, Ware
Church Development
Value of works:
£200k
Scope Of Works:
- Breakout existing concrete slab and removal off site
- Excavate to formation and removal of arisings
- Cast reinforced ground floor slab including sub-structures works below proposed block and beam
- Install 150mm depth block and beam with infill 7N blocks
- Install lime screed as per architects specification
- Storm and foul drainage