CHRIST HOSPITAL SCHOOL
Independent School in Horsham
Value of works:
Circa £2.2m
Scope Of Works:
- Demolition and enabling works including protection of existing basement and underground service tunnel which serves the entire School with services
- Installation of piling mat, piling attendance, piling package
- Infill existing basement with foam concrete system to fill void read for foundations
- Construction of large haul road and compound for the main build, 6000m2 including sub-base and tarmac works
- Ground beams & pile caps including holding down bolts for the steel frame
- External package including tarmac, resin bound gravel, tar & chip and block paving
- Ground floor reinforced concrete slab tied into the ground beams – 2000m2 with 135t of cut & bent reinforcement installed
- Storm and foul drainage up to 3m in depth including connection works