OXHEY PARK - WATFORD
Public Park
Value of works:
£1.25m
Scope Of Works:
- Site clearance and earthworks including removal of clean, non hazardous and hazardous material off site
- Installation of 3m concrete road through the middle of the site to service the build programme, 400m in length
- Earthworks and pond liners installed
- Installation of 20nr pre-cast headwalls to ponds and swales
- Reinforced slab to new Café which included gas membranes, petrol interceptors and foul storage tanks
- 2000m of timber edgings, aluminium and concrete edgings to footpaths
- Breedon Gravel footpaths
- Resin footpaths
- Bod Pav system to car parks and lay-bys
- S278 works including traffic management, tarmac and associated works